Monday, March 26, 2012
New Resident in Tiki Hut
Hawaiian Tiki God of Money has moved into the hut to bring prosperity and luck to the Tiki hut. Its made of fiberglass and the eyes light up. The Tiki came from a Las Vegas resort pool. Super cool!
Sunday, March 25, 2012
Half the Roof is ON!
I have been working night and day to get the shack dried in. I have completed all the structural bamboo and loft including railings so the kids don't fall out. Very excited and getting ready for my memorial day pig roast. Let me know if you want to be invited. Enjoy the progress!
half of the elephant grass is installedlove the feel and look of the thatch
loft railings on back
kids won't fall out
I had to criss cross all along the bottom to create more strength and stability - highly suggested
nice corner lashings
I had to join two pieces to get the length I needed for one last long piece...this is how it was done
THE TIKI RANCHER!
KONA THINKS ITS HIS DOG HOUSE
looking good in the hood
expanding foam in any open cavities keep water and bugs out!
Tuesday, March 6, 2012
Huge Progess on Bamboo Barn
As I build the Tiki barn I have been designing many areas as I go, this weekend was focused on how the roof was going to be engineered and tightening up lashings and securing support beams along with the loft.
I believe I've figured out how the whole thing is going to be finished now.
I will have just enough bamboo to make it!
Thank god, really don't want to go cut anymore down right now.
Next week I should be able to start installing the thatch roofing materials.
corner lashing
door lashing
front view of structure
corner view of new progress new lashings
I'm using hardwood pins to tie everything together along with rope
loft lashings
side support lashing
Elephant grass thatching for roof will be stapled on to the battons
shot from the deck this morning
Subscribe to:
Posts (Atom)